KonKat Docs

Templates

Reusable sequences of steps — like a column casting or slab cycle — that you add to a plan in one go, already grouped, linked and with materials and rooms filled in.

ForOwnerAdminEngineer
On this page

Most building work repeats: the same slab cycle on every floor, the same finishing sequence in every flat. A template is a saved list of those steps. Using it adds all the steps to the plan as tasks, already grouped and linked, so a ten-floor slab plan takes minutes.

How templates work#

  1. Make or pick a template — e.g. Column casting: steel tying → shuttering setup → concrete pouring → curing → de-shuttering → debris clearing. Each step has a normal duration, and whether it follows the step before it.
  2. Group the steps — in the editor, › puts a step inside the one above it (a group) and ‹ takes it out. Groups become parent tasks on the plan.
  3. Use it on a project — choose the start date and the floors. All steps are added as tasks, linked one after another.
  4. Adjust on the plan — the added tasks are normal tasks. Changing the template later does not change tasks already added; it only affects the next time you use it.

The Templates screen#

Open Templates (Admin group). The list shows every template with its description; ready-made ones are tagged Built-in. Each has Edit steps (or View) and Use on the plan. Templates are shared by all projects.

Edit a template#

The Column casting template: steps with days, lag, link, how progress is recorded, materials and flags.
The Column casting template: steps with days, lag, link, how progress is recorded, materials and flags.

At the top: Template name, Category and Description. Below, one row per step:

Column What to enter
Step The step name, with ‹ / › to group. A step with steps indented under it shows in bold.
Days Normal duration, e.g. 2 for steel tying, 7 for curing.
Lag Days of gap after the step before, e.g. 1.
Link Ticked = starts after the step before it.
Recorded Floor or Flat, and tracking Days, Units or Qty.
Rooms / materials Rooms for flat steps (e.g. Bathroom, Kitchen) and a comma-separated materials checklist (e.g. Steel bars, Binding wire).
Flags Ancillary (curing, cleaning) and Sign-off (needs sign-off when done).

Use ↑ / ↓ to move a step, + to add a step below, and × to delete one. Tap Save template, or Back to leave without saving.

Make a new template#

Tap New template, give it a name and category, and add steps. A good way to start is to write the steps exactly as your site does them, with your usual durations.

Delete a template#

Delete appears for templates you made (not built-in ones). A template that has been used on a plan can’t be deleted — rename it instead.

Use a template on the plan#

  1. Start — tap Use on the plan on the Templates screen, or From template on the Plan.
  2. Template — pick it from the list (shown with its category).
  3. Start date — the first step starts here; the rest follow in order. It starts as today once the project has started, otherwise the project start date.
  4. Floors — which floors these tasks are for: 3 for the 3rd floor, 0 for the stilt floor, 1-4 for several. Blank means the whole building.
  5. Name on the board — optional, e.g. 3rd floor columns. Otherwise the group is named after the template.
  6. Tap Add to plan.

Konkat adds one parent task with every step under it — grouped as in the template, linked one after another with the lags, and with durations, materials and rooms filled in. Steps marked Sign-off need sign-off when done.

For a ten-floor building, add the template once for the 1st floor, check it, then use Duplicate group or Copy and Paste: Konkat suggests the next floor’s name and floor number each time. See The Gantt chart.

Who can do what#

  • Use on the plan needs Edit the plan on the project.
  • Saving a template needs an account type of Owner, Admin or Engineer (People screen).
  • Deleting a template needs an account type of Owner or Admin.

Common questions#

I edited the template. Why didn’t the plan change?#

By design. Tasks on the plan are a copy. Edit them on the plan, or delete and re-add them from the template if nothing is recorded on them yet.

The steps came in with “Ground” in their names.#

Use Project setup → Units → Rename existing names… and tick Also rename steps in the template library. See Floors and units.

Was this page helpful?

Updated October 12, 2026

Still need help?

Ask your project owner or administrator — or check the FAQ and troubleshooting pages.